FR
La Source Maplewood seen from Maplewood Avenue: three brick volumes with large arches, among autumn trees

The look of three grand houses. Twenty families.

Sign the petition
Scroll

A word from the developer

In 2026, building differently is no longer an option. It is a responsibility.

I am the developer of La Source Maplewood. I have completed several residential projects in Outremont, including 831 Rockland, Maisons Outremont at 11 Côte du Vésinet, and La Chapelle at 440 Querbes Street. I know and deeply respect the neighbourhood’s unique character.

Preserving Outremont does not mean freezing it in time. It also means allowing it to evolve thoughtfully.

Faced with environmental, energy and demographic challenges, we must rethink the way we live. La Source Maplewood reflects this commitment to thoughtful densification: designed according to the principles of the LEED program, the project emphasizes energy efficiency, shared resources and universal accessibility.

Rather than building three large individual homes, we propose 20 homes within a building whose architecture evokes three distinct houses. This approach makes better use of the land, reduces the environmental footprint per home and gives more people the opportunity to live and grow older in Outremont.

For two years, we have been working with a team of professionals and the City’s urban planning division to balance heritage enhancement, architectural quality and respect for the neighbourhood. We met with the neighbours twice, listened to their concerns and adapted the project accordingly.

— Florent Moser, Groupe Moser

20three-bedroom family residences, each on a single level
32new trees planted, mature trees along the front kept
50%of the lot under plant cover
40indoor parking spaces, a single vehicle entrance
3storeys at most, 13.9 m high
~14 minon foot (1 km) to the Édouard-Montpetit REM station

Three houses or twenty families: which is the more responsible choice?

On a lot of about 40,000 square feet, there are two options: build three large single-family houses, or welcome twenty families in a high-end residential building aiming for LEED certification.

We cannot denounce urban sprawl, the loss of natural habitats and the growth of car travel while refusing to densify, thoughtfully, neighbourhoods already served by municipal infrastructure.

This is not about building more at any cost. It is about making better use of our land, a limited resource, while choosing sustainable and responsible construction.

3 houses

3 families. No comparable environmental certification. Siting that could threaten mature trees along the front.

or

La Source Maplewood

20 families

Nearly seven times as many families on the same lot, in a building aiming for LEED, with 50% plant cover and a restored Provost Creek.

The 15-minute city

The REM, schools and shops close by.

With its 2050 Urban Planning and Mobility Plan, Montréal wants complete neighbourhoods. The Édouard-Montpetit REM station is about 1 km away, a 14-minute walk, with a connection to the metro’s blue line. Why push families to settle ever farther away when we can offer them an exceptional place to live, close to everything?

“Optimize land use while ensuring a density suited to each setting.”

2050 Urban Planning and Mobility Plan, City of Montréal (translated)

Architecture that respects the character of Maplewood.

The look of grand houses. The comfort of contemporary residences. A single three-storey building whose composition suggests three distinct grand homes rather than a conventional condominium building. The current buildings on the site have little architectural interest. La Source offers a more careful design that enhances the street and enriches the neighbourhood’s landscape.

Materials

Brick and natural stone, noble and timeless materials.

Brick sample
Brick sample
Brick sample
Roofing sample
Rendering of the project’s brick facades
Bright interior under a cathedral ceiling, arched windows

The residences

Keep the look. Expand the ways of living.

The look of three grand houses. The intelligence of a single building. Twenty residences designed for the future.

Architectural study in progress. Images are preliminary and may change. Full accessibility will depend on the planned features, including elevators and barrier-free access.

Twenty families, more trees.

Welcoming more families does not mean sacrificing nature. Scroll to watch the site change, from today’s conditions to the landscape concept.

Read the landscape study (PDF, in French)
Plan of existing conditions and the proposed footprint Landscape concept in colour Detail of the creek courtyard
Today

The site today

The future building (in grey) over the tree survey. In dark green, the existing mature trees, including those lining Maplewood Avenue. On the site itself, most are Norway maples, a species considered invasive.

Trees to remove

23 trees to remove

19 of them rated medium, low or questionable value by the forestry engineer’s report. They are mostly in the building or excavation area, and near the creek where the existing structures will be removed.

Planting

32 new trees

A ratio of 1.3 trees planted per tree removed. Eleven trees are kept and protected. The new species, more diverse and better suited, improve biodiversity and the resilience of the canopy.

Landscape concept

Five spaces, one balance

  1. 1 The front yard, a threshold between public and private
  2. 2 The backyard, for rest and contemplation
  3. 3 The creek courtyard, an ecological corridor
  4. 4 The restorative garden, open to the community
  5. 5 The natural hedge
Creek courtyard

Giving the creek back its natural character

Asphalt and low walls removed, a gentler natural slope to the west, planting along the bank: a more natural, functional shoreline, and a pool at the heart of the restorative garden.

Flowering woodland beside a creek
Intended feel, creek courtyard
Path lined with woodland plants
Layers of planting
Bunchberry in bloom
Native ground layer

Provost Creek, open again to the life of the neighbourhood.

The same view tomorrow: a renaturalized creek among stones and ferns, with a path and a wooden bench
The creek today: an overgrown stone channel
Today Tomorrow

Scroll or drag: from today’s masonry channel to the restored creek, seen from the same spot. AI-generated concept image, for illustration only.

Outremont’s creek, also called Provost or Springgrove Creek, rises on Mount Royal. The project will restore it and create a restorative park open to the whole community.

The CCU (the borough’s urban planning advisory committee) also requires an agreement with the borough guaranteeing public access to the areas near the creek before the building permit, and landscaping that protects it in line with the RMUN by-law.

A 10-metre riparian strip, free of any construction, is preserved.

Three centuries of history

1702Old map of the island of Montréal

François Vachon de Belmont’s map already shows Côte Sainte-Catherine and the course of the creek.

1856Plan of the Spring Grove property, 1856

Subdivision of the McCulloch heirs’ Spring Grove property: the lot and its creek appear on it.

1906Old photograph of a large house

The Missionary Sisters of the Immaculate Conception move in. The creek’s course will stay almost unchanged.

1987Old map of Lac Saint-Louis

Major channelling works when the convent was enlarged: today’s masonry channel.

2029Concept image of the park: a family and their dog near a pool surrounded by stones

Paved surfaces removed, banks renaturalized and a restorative park open to all.

Concept image of the park: a family and their dog stop at the edge of a small pool ringed with flat stones, beside a curved bench, under big trees among ferns
AI-generated concept image, for illustration only.

The restorative park

A park open to all, beside the creek.

A public garden where you can see the creek, where children can play and where neighbours can meet.

  • A pool that highlights the creek
  • Stones, a bench and paths under the big trees
  • Guaranteed free access for citizens, as the CCU requires
Discover the park

A unanimous recommendation from the urban planning advisory committee.

See the conditions

This recommendation is not a permit. The project continues through the regulatory process.

October 15, 2026 Unanimous

The CCU recommends that the borough council accept the project, with conditions, so that its review can continue under the PIIA (site planning and architectural integration program).

Projected timeline

Design
July 2025 – March 2027
Regulatory process and permits
March 2026 – March 2027
Marketing and pre-sales
March 2027 – August 2027
Construction and landscaping
August 2027 – May 2029
Move-in
spring 2029

Projected schedule, subject to obtaining the required approvals.

The developer

Groupe Moser has been building residential projects in Outremont for many years. Florent Moser grew up in the area. The project’s architecture is by ACDF.

groupemoser.ca ↗
831 Rockland
831 Rockland, 2013
Maisons Outremont
Maisons Outremont, 2019
La Chapelle, Querbes Street
La Chapelle, 2025
Street view in autumn sunlight

The choice is not between preserving Outremont and letting it evolve. The real challenge is to succeed at both. The street’s character can be respected while welcoming new residents. Architectural quality and the contribution to the neighbourhood should guide the evaluation.

Let’s talk.

A question about the project, the construction or the studies? Write to us.

info@lasourcemaplewood.ca